Request a free estimate Call (586) 722-3277

Planning · 7 min read

Living at Home During Interior Painting: Pets, Kids, Work and Odor

Most households can stay in the house during interior painting. A little planning for rooms, routines, pets and ventilation makes it far easier.

Yes, most households can live at home during interior painting. The key is planning: decide which rooms stay usable, where pets and children go, how you will ventilate, and where you will sleep and work. Clear the room, keep walkways open, and talk with the painters about daily access so nobody is tripping over wet paint.

Key takeaways

  • Most households can stay home during interior painting if they plan which rooms are in use, where pets go and how to ventilate.
  • Move what you can, clear the walls and tell the painters what is fragile, so the work starts without delay.
  • Odor and wet paint are the main daily annoyances, so plan sleeping, meals and work away from freshly painted rooms.
  • Agree on a daily rhythm, access and a final walkthrough ahead of time so surprises stay small.
Jump to a section
  1. Can you really stay home while the house is painted?
  2. What should you do before the painters arrive?
  3. What about pets, children and working from home?
  4. How do you handle the paint smell?
  5. How do you plan sleeping, meals and daily routine?
  6. How do you manage the kitchen and bathrooms?
  7. What should I expect each day?
  8. When is it easier to leave the house for a bit?
  9. Questions

Can you really stay home while the house is painted?

In most cases, yes. Painting can be sequenced room by room or area by area, so the rest of the house stays livable. What changes is the routine: some rooms are off limits, furniture is moved or stacked, and there is a paint smell for a while.

A few situations make a night or two away worth considering, and we cover them at the end of this guide. We cannot speak to how any paint affects anyone’s health, so if breathing or medical conditions are a concern, ask your doctor and read the product label. Many paints are sold as low-odor, which helps with comfort, but odor still lingers for some time.

The painter’s own process helps. A careful painter protects floors, furniture and plants and finishes with a walkthrough and touch-ups. That is how the Guiffre’s Painting Co. process is laid out, and it is a good standard to ask any painter about. It also helps to know who will be in your house each day. At Guiffre’s, Bob and Bobby are on every project.

Timing can make staying home easier. Mild weather lets you air out rooms, which is one reason spring and fall are popular; our guide to the time of year to paint an interior in Michigan compares the seasons. Think about your household’s rhythm, too. A family with school mornings needs the kitchen and main bathroom at predictable times, while someone retired may happily hand over the whole first floor.

What should you do before the painters arrive?

Preparing the house is the biggest thing you can do to keep a project calm. Our guide to preparing your home for interior painters has the full checklist (there is also a one-page printable room prep checklist). The short version:

  • Clear the surfaces. Remove small items, décor, rugs you want kept clean and anything fragile. Take pictures and art off the walls.
  • Pull furniture away from walls where you can. A careful painter protects floors and furniture, but the more open the room, the easier it is to work cleanly.
  • Empty closets that are being painted and clear the floor around baseboards.
  • Secure valuables and medications. Put them somewhere out of the work area.
  • Tell the painters about problems you know of. Cracks, loose plaster, old stains or that sticky door are easier to plan for in advance.

In many older Grosse Pointe homes, radiators, original hardwood floors and built-ins are part of the picture. Point out anything that needs extra care, such as a floor that scuffs easily or a built-in with glass doors.

What about pets, children and working from home?

Pets

Cats, dogs and birds do best away from the work. Doors left open, ladders, wet trim and open cans are all hazards. Many families choose a closed-off room, a friend’s house or daytime boarding. Birds are especially sensitive to fumes, so ask your vet what to do if you have one. Keep paint cans, cleaning liquids and rags out of reach of animals.

Kids

Wet paint is irresistible to small hands. Decide which rooms are closed, tell children plainly why, and keep a few play areas away from the work. For older kids, a note on the door saying “wet paint” works better than a lecture.

Working from home

Painting means noise, comings and goings, and a smell. If you can, schedule video calls from a room that is not being painted, or from somewhere else. A bedroom or finished basement can double as an office while the main rooms are painted.

How do you handle the paint smell?

Fresh paint smells for a while. Ventilate by opening windows where the weather allows, running fans carefully, and keeping doors to unpainted rooms closed so odor does not travel. In a Michigan winter, windows cannot stay open for long; keep the house warm enough, as paint needs to stay above the temperature on the label to cure well. Our winter interior painting guide covers it in detail.

Ask which products are planned. Water-based paints generally smell less than the oil-based or shellac-based primers and enamels sometimes used for stain blocking or old woodwork, so check the label and ask when the stronger-smelling steps will happen. Rags soaked with oil-based products can catch fire on their own as they dry if they are left bunched together. The usual advice, which the label will confirm, is to spread them flat outdoors, away from buildings, until completely dry, or to seal them in a water-filled metal container, then follow your community’s disposal rules.

Odor fades faster than the paint cures. Dry to the touch is hours; full cure takes weeks. During that time, be gentle with new paint: no scrubbing, no taping, no heavy items hung or leaned against it. See dry time vs. cure time.

If someone is sleeping in a bedroom that was just painted, give it time. Our guide to painting a bedroom or nursery goes through timing and airing.

Painting rooms like this in Grosse Pointe?

Tell us about your home and we’ll be in touch to talk it through.

Request a free estimate

How do you plan sleeping, meals and daily routine?

A little structure goes a long way. Talk with the painters before the start date about:

  1. Which rooms are being worked on each day, and in what order.
  2. Daily start and finish times and whether you are home. Agree on a plain-English routine rather than assuming.
  3. Which entrances and bathrooms the painters will use and where they will keep supplies.
  4. Where you will sleep. If a bedroom is next, plan to use another room or give it time to air.
  5. Which areas need to stay usable, such as the kitchen for meals or a bathroom you cannot be without.

A written scope that lists rooms, surfaces and prep is a good place to settle the order of the rooms. Ask any painter whether theirs does, read it with your household’s routine in mind, and raise needs like school mornings or a work-from-home day before the work starts, not after.

How do you manage the kitchen and bathrooms?

These are the two rooms a household can least do without, so plan them first. If the kitchen is on the list, ask for it to be sequenced so you keep a refrigerator, a sink and a place to eat on most days, and expect to eat simply while that room is being done. Our guide to painting kitchens explains the prep, such as degreasing walls, that adds time to that room.

Bathrooms are the other pinch point. If you have more than one, keep one out of the work zone. For the painted bathroom, ask when it can take a long hot shower again, because steam and splashing on paint that has not cured can mark it. The label and the painter can tell you how long to wait.

What should I expect each day?

Expect furniture to be shifted, drop cloths on floors, painter’s tape on trim and some noise from scraping and sanding. Prep is the largest part of a good paint job, and it can be the dustiest. Close the doors to unpainted rooms, and ask how dust will be controlled.

Homes built before 1978 may have lead paint in some layers, and older textured ceilings and some old plasters may contain asbestos. Scraping and sanding can disturb both, so do not scrape or sand those surfaces yourself without testing first, and do not dry sweep or run an ordinary household vacuum over the dust, which can blow it back into the air. Damp wiping and a HEPA-filter vacuum are the usual recommendation, so ask how any painter cleans up. If an asbestos test is positive, leave the material undisturbed and talk to a qualified asbestos professional about whether to leave it, encapsulate (seal) it or remove it; do not scrape, sand, roll or spray it yourself. The EPA’s Renovation, Repair and Painting rule requires certified firms and lead-safe work practices for paid work that generally disturbs more than 6 square feet of painted surface per room inside a pre-1978 home, so ask any painter how they handle it, and tell them about anything you already know. Keep children, pets and anyone pregnant out of rooms where scraping or sanding is happening. Our lead paint guide covers the basics.

At the end of the project, walk through each room together in good light. Check corners, trim lines, ceiling edges and behind doors, and note touch-ups. Then put things back slowly, and wait before pushing furniture tight against fresh walls, since paint that is dry to the touch can still be soft.

When is it easier to leave the house for a bit?

A short stay elsewhere may be simpler if nearly every room is being painted in a small home, if floor refinishing or other strong-smelling work is happening at the same time, or if someone in the household is sensitive to odors. In January, when the windows have to stay shut, a night or two away is easier to justify than in May.

A second option is to schedule the work in phases: bedrooms first, living areas later. Either way, a written scope that lists rooms, surfaces and prep keeps everyone on the same page. For help setting that up, start with our interior painting page.

The aim is a project that is boring for you: no surprises, a tidy house at the end of each day, and a finish you can live with for years.

Questions

Do I have to move out while my house is painted?

Usually not. Most households can stay, using the rooms that are not being painted. A short stay elsewhere can help if most of the house is being done, or if anyone is sensitive to odors.

How long does the paint smell last?

Many paints smell strongest for the first day or two and fade as they dry, but this varies with the product, ventilation and temperature. Dry to the touch is hours away, while a full cure takes weeks. Check the label for guidance.

What should I do with my pets during painting?

Keep them away from the work area in a separate room, with a friend, or in daycare. Open cans, wet trim, ladders and doors left ajar are all hazards. Ask your vet about birds, which are sensitive to fumes.

Ready for a clear estimate?Tell us about your home and we’ll be in touch to talk it through.

About the author

Guiffre's Painting Co.

Family-owned interior painting and plaster repair serving Grosse Pointe and Metro Detroit. Owner Bob Guiffre has been painting for more than 37 years — more than 1,800 homes — and his son, Bobby, works beside him on every project. We paint with Sherwin-Williams. Estimates are free. Insured: $1,000,000 general liability. Call (586) 722-3277.

Let’s talk about your home.

Tell us a little about the project and we’ll be in touch to talk it through and set a time to see it. Estimates are free.

Request a free estimate Call